IEC 60601-1 Clause 16 ME Systems: Testing Combinations of Equipment

IEC 60601-1 Clause 16 ME Systems: Testing Combinations of Equipment

An ultrasound or endoscopy console sits on a cart with a monitor, a printer and a workstation PC. A rehabilitation trainer is linked to an ordinary PC by USB, and the patient watches a screen while exercising. Where the manufacturer specifies the combination and the items are linked by data connections or a shared multiple socket-outlet, IEC 60601-1 (GB 9706.1 in China) calls such a mix of medical and general-purpose equipment a medical electrical system (ME system), and puts its specific requirements in Clause 16. This article covers identifying an ME system, marking out the patient environment, non-medical equipment and multiple socket-outlets, preparing two typical set-ups, and which SUNGO laboratory does the work under which accreditation. No limit values are quoted; the standard text governs.

Key points first

  • Under GB 9706.1-2020 definition 3.64 (source given under the terms below), an ME system is a manufacturer-specified combination of equipment, linked by a functional connection or a multiple socket-outlet, including at least one item of ME equipment.
  • ME systems once had their own collateral standard, IEC 60601-1-1:2000 (GB 9706.15-2008 in China). The third edition of IEC 60601-1 replaced it; GB 9706.15-2008 was withdrawn on 2023-05-01, replaced by GB 9706.1-2020.
  • Clause 16 has nine subclauses, 16.1 to 16.9, listed below; informative Annex I covers ME system aspects.
  • Settle the patient environment first. The example figure from GB 9706.1-2020, as reproduced in Annex D of the YY/T 0841 draft, shows 1.5 m around the bed as the minimum extent where there are no constraints (check the original GB figure).
  • Evidence that a PC, monitor or other non-medical item meets its own safety standard (for example IEC 62368-1) comes from the manufacturer; such standards are outside SUNGO's accreditation scope.
  • IEC 60601-1, EN 60601-1 and GB 9706.1 are within the IAS accreditation scope of the Hefei laboratory (TL-1119). The scope lists them as whole standards, without edition years.

Standards and scope

Three designations and their editions

IEC 60601-1, Medical electrical equipment – Part 1: General requirements for basic safety and essential performance. As of 2026-10-22, the IEC Webstore lists consolidated Edition 3.2, published 2020-08-20, which combines the 2005 third edition with Amendment 1 (2012) and Amendment 2 (2020). The foreword of the third edition states that it also cancels and replaces the second edition of IEC 60601-1-1 published in 2000, so the ME system requirements now sit in the general standard.

GB 9706.1-2020 is a mandatory Chinese national standard, published 2020-04-09 and in force from 2023-05-01. It is a modified adoption of IEC 60601-1:2012 (Edition 3.1) and fully replaces GB 9706.1-2007 and GB 9706.15-2008. GB 9706.15-2008, the collateral standard on safety requirements for medical electrical systems, was an identical adoption of IEC 60601-1-1:2000.

EN 60601-1 is the European designation. EN 60601-1:2006/A2:2021, for example, adopts IEC 60601-1:2005/A2:2020 without modification.

Under 1.1, a clause applies to both ME equipment and ME systems unless its title and content say otherwise, so other clauses apply to systems too (Clause 9, for example, is titled "Protection against mechanical hazards of ME equipment and ME systems"). Under 1.4, particular standards may modify, replace or delete requirements of the general standard.

Terms to get clear first

These summarise GB 9706.1-2020 definitions as quoted in the consultation draft of Chinese industry standard YY/T 0841 (a modified adoption of IEC 62353:2014 on recurrent tests and tests after repair); the GB text governs.

  • ME system (3.64): a combination of items of equipment, as specified by the manufacturer, interconnected by a functional connection or by a multiple socket-outlet, at least one of which is ME equipment.
  • ME equipment (3.63): one condition in the definition is that it has not more than one connection to a particular supply mains.
  • Manufacturer (3.55): includes the natural or legal person responsible for assembling an ME system.
  • Multiple socket-outlet (MSO) (3.67): one or more socket-outlets intended to supply mains voltage or an equivalent voltage; it can be a separate unit or integrated into equipment.
  • Patient environment (3.79): any volume in which intentional or unintentional contact can occur between the patient and parts of the ME equipment or ME system, or between the patient and other persons touching those parts.

Structure of Clause 16

Subclauses are taken from the contents of IEC 60601-1 Edition 3.2 (GB titles follow the GB text). An asterisk means Annex A gives guidance or rationale. The third column is our suggestion, not text from the standard.

SubclauseTitleSuggested preparation
16.1 *General requirements for the ME systemsComponent list, layout drawing, patient environment boundary
16.2 *Accompanying documents of an ME systemSystem section of the instructions for use
16.3 *Power supplyPower distribution diagram
16.4EnclosuresDescription and photos of the assembled arrangement
16.5 *Separation devicesList of inter-equipment connections, isolator data
16.6 *Leakage currentsComplete configuration with all interconnecting cables
16.7 *Protection against mechanical hazardsCart loading list, rated loads of arms and mounts
16.8Interruption of the power supply to parts of an ME systemDescription of system behaviour when one item loses power
16.9ME system connections and wiringCable and connector list, wiring diagram

Related informative material: Figures A.9 (patient environment example) and A.7 (a PC with an ECG module) in Annex A; Table I.1 (examples of ME systems) and Figures I.1 and I.2 (MSO examples) in Annex I, "ME systems aspects".

Key topics in Clause 16

1. Is it an ME system?

The judgements below all assume the two conditions in the definition: the manufacturer specifies the combination, and at least one item is ME equipment.

  • ME equipment connected by a data cable to a PC running its software: a functional connection, the typical ME system case (compare Figure A.7).
  • Several items with no data link that share the multiple socket-outlet on a cart: by definition this is also an ME system.
  • Items on a cart each plugged into the wall but linked by data cables: still an ME system. As ME equipment has not more than one connection to a particular supply mains, do not describe the cart as "one piece of ME equipment"; agree the evaluation object with the laboratory first.
  • A hospital or integrator combining equipment from different makers: under 3.55, whoever is responsible for the assembly is the manufacturer of the ME system.

2. Mark out the patient environment

The second half of the definition is easy to miss: if a nurse touches the patient with one hand and the printer with the other, the printer counts. Figure A.9 of IEC 60601-1 gives an example. Annex D of the YY/T 0841 draft reproduces a figure marked as taken from GB 9706.1-2020, showing 1.5 m around the bed as the minimum extent where there are no constraints; check the vertical extent against the original figure. Draw this zone on the layout drawing and mark each item inside or outside; if the patient moves, use the area the patient can reach.

3. Non-medical equipment in the system

Annex H of the YY/T 0841 draft explains the idea: inside the patient environment, leakage current limits for the ME system or its parts should equal those for a single item of ME equipment; outside it, safety should be kept at the level of each item's applicable standard. So the same PC faces different requirements depending on where it sits. The exact 16.1 requirements for non-medical equipment, and the measures when they are not met, are in IEC 60601-1.

The manufacturer supplies evidence that non-medical items meet their own safety standards (see Key points first); we test the system-level items under IEC 60601-1.

4. Isolation transformers and separation devices

Subclause 16.5 covers separation devices; the definition and requirements are in the standard. Two kinds of isolation are common:

  • Power side: an isolation transformer supplies the whole system or part of it. The normative references of IEC 60601-1 include IEC 61558-2-1 (particular requirements for separating transformers for general use). Clause 4.1 of the YY/T 0841 draft states that where an ME system or part of it is connected to the mains through an isolation transformer, the transformer is included in the measurement.
  • Signal side: data, video and network cables between items, especially connections leaving the patient environment, such as to the hospital network. Annex H of the YY/T 0841 draft notes that where a network isolator is used, retesting should verify that it is still present.

Tabulate every inter-equipment connection: equipment at each end, whether it leaves the patient environment, isolation method and isolator model. The manufacturer should supply conformity data for the transformer itself (IEC 61558-2-1 is outside SUNGO's accreditation scope).

5. Multiple socket-outlets (MSO)

An MSO is what most people call a power strip or extension socket. Because an MSO can be built into equipment, a cart socket panel or a console outlet feeding a monitor may fall under the definition. Figures I.1 and I.2 in Annex I show MSO construction and application examples; Annex H.3 of the YY/T 0841 draft also refers those assembling an ME system to Table I.1 and Figure I.2 of GB 9706.1-2020. How an MSO is connected and marked, what may be plugged into it and how related currents are assessed are set out in Clause 16.

In service, Annex H of the YY/T 0841 draft says that retesting should assess the quality and suitability of any MSO used and measure the total resistance from the earth terminal of its mains plug to the earthed accessible conductive parts of the system. Treat the MSO as a fixed part of the system design rather than leaving the choice to the user.

6. Leakage current: assess the combination as a whole

Subclause 16.6 covers leakage currents of ME systems. Under GB 9706.1-2020 definition 3.129, touch current is leakage current from an enclosure or part accessible to the patient or operator in normal use (excluding patient connections), through an external path other than the protective earth conductor, to earth or another part of the enclosure. Combined items can add or redirect leakage through shared supply paths and cable screens, so units that pass singly may not pass as a system; test the complete configuration. Which currents 16.6 covers and their limits are in the standard; leakage current for single ME equipment is in 8.7. For common causes of failure, see Electrical Safety Failures: Creepage, Earthing and Leakage Current.

7. Accompanying documents: describe the system clearly

The detailed content of 16.2 is in the standard. The laboratory must be able to rebuild "the combination specified by the manufacturer" from the accompanying documents. We suggest stating at least: the items and their models or required specifications; power and signal connections; intended positions and which items may be in the patient environment; whether and how items may be substituted; and instructions and warnings for MSOs, isolation transformers and separation devices. Annex H of the YY/T 0841 draft also recommends a visible component list on the system and a warning not to connect other equipment.

8. Mechanical hazards and EMC

  • 16.7: read together with Clause 9. When monitors, printers and workstations are stacked on a cart, assess cart stability and the load on arms and mounts in the assembled state.
  • Clause 17: electromagnetic compatibility of ME equipment and ME systems; the normative references include IEC 60601-1-2:2014 with its 2020 amendment. See our EMC testing service.

Two typical set-ups

Set-up 1: cart-mounted ultrasound or endoscopy workstation

Typical make-up: the console (ME equipment, with applied parts such as probes or endoscopes), a monitor, an image workstation PC and a printer, powered through an MSO or isolation transformer on the cart, with a network port to the hospital information system.

  1. Draw the system diagram first: which items are ME equipment and how power and signals run. With the cart at the bedside, decide which items are inside the patient environment.
  2. Submit the complete configuration: console, cart, MSO or isolation transformer, monitor, PC, printer and all interconnecting cables. With the console alone, system-level leakage, the MSO and separation devices cannot be assessed.
  3. Explain network isolation: whether a network isolator or other separation is used, with model and data.
  4. Cart data: full-load list and weights, and rated loads of arms and mounts.
  5. Clarify particular standards: such consoles usually have a particular standard that may modify the general standard. Those particular standards are outside SUNGO's accreditation scope (see below), so what can be commissioned is evaluation to the general standard IEC 60601-1 (GB 9706.1); confirm the scope before ordering.

Set-up 2: rehabilitation trainer with a PC and monitor

Typical make-up: a rehabilitation trainer (ME equipment, with handles, straps or pedals the patient touches), a general-purpose PC running the training software, and a monitor facing the patient, with USB or serial communication between PC and trainer.

  1. Measure positions: the monitor in front of the patient is very likely inside the patient environment; judge the PC from its actual distance.
  2. Evidence for non-medical items: certificates or reports for the PC and monitor against their own safety standards. Inside the patient environment, look at leakage current as in topic 3; the measures needed are in the standard.
  3. Isolation of the communication cable: whether the USB link needs isolation, and which isolator to use, depends on the trainer's insulation diagram and applied parts. For identifying applied parts, see How to Classify ME Equipment and Identify Applied Parts.
  4. Is the PC model fixed? If only a minimum specification is defined, state it in the accompanying documents, test with a representative PC and record its model.
  5. Home use: IEC 60601-1-11 (YY 9706.111) also applies; its title covers ME equipment and ME systems used in the home healthcare environment. It is also within the Hefei laboratory's IAS scope and is covered in a separate article on this site.
  6. Software: life-cycle evaluation of the training software to IEC 62304 is outside SUNGO's accreditation scope.

Accreditation scope

Entries in the Hefei laboratory's IAS scope (TL-1119) relevant to this article; all are listed as whole standards.

ItemStandard / clauseNotes / limitations
Whole standardIEC 60601-1 (no clause or year listed)No limitation stated. Listed title: Medical electrical equipment - Part 1: General requirements for basic safety and essential performance
Whole standardEN 60601-1 (no clause or year listed)No limitation stated. Same title
Whole standardGB 9706.1 (no clause or year listed)No limitation stated. Same title
Whole standardIEC 60601-1-11 (no clause or year listed)No limitation stated. Listed title: Medical electrical equipment - Part 1-11: General requirements for basic safety and essential performance - Collateral Standard: Requirements for medical electrical equipment and medical electrical systems used in the home healthcare environment
Whole standardEN 60601-1-11 (no clause or year listed)No limitation stated. Same title
Whole standardYY 9706.111 (no clause or year listed)No limitation stated. Same title

Where SUNGO does this work and under which accreditation

  • Laboratory: the Hefei laboratory, Zipeng Town, Feixi County, Hefei, Anhui Province.
  • Legal entity: Hefei SUNGO Medical Technology Co., Ltd., an independent legal entity.
  • Accreditation: IAS, certificate TL-1119, scope effective 2026-06-04. IEC 60601-1, EN 60601-1 and GB 9706.1 are within the IAS accreditation scope of the Hefei laboratory (TL-1119); testing to these standards is reported under IAS.
  1. The IAS scope does not state edition years. State the edition you need when ordering, for example IEC 60601-1 Edition 3.2 or GB 9706.1-2020, and confirm the edition with the laboratory before an IAS report is issued against it.
  2. Whether a report can be used for registration or certification in a given market should be confirmed in advance with the regulator or notified body.
  3. IEC 62368-1, IEC 61558-2-1, IEC 62353 (YY/T 0841), IEC 62304 and the particular standards for ultrasound, endoscopy and similar consoles are background only and outside SUNGO's accreditation scope. Of the IEC 60601-2-x / ISO 80601-2-x / GB and YY 9706.2xx particular standards, SUNGO's scope covers only ISO 80601-2-69 for oxygen concentrators, within the Hefei laboratory's IAS scope (TL-1119). The accreditation scope of Shanghai SUNGO Medical Technology Co., Ltd. (laboratory at No. 958 Kangqiao East Road, Pudong, Shanghai) does not include the standards in this article.

Preparing a submission

  • System component list: name, model and manufacturer of every item, marked ME equipment or not.
  • Layout drawing: the patient environment and the position of each item in intended use.
  • Power and signal diagram: MSOs, isolation transformers and separation devices with models, and the isolation method for each connection.
  • Safety evidence for non-medical items: certificates or reports for PCs, monitors and printers.
  • Data for each item of ME equipment: classification, applied part types, insulation diagram and any existing single-unit reports.
  • Accompanying documents: the system sections of the instructions for use.
  • Samples: the complete manufacturer-specified configuration, with all interconnecting cables and accessories.
  • Target market and standard edition.

FAQ

If a hospital combines several devices itself, whose ME system is it?

Under GB 9706.1-2020 definition 3.55, whoever is responsible for assembling an ME system is a manufacturer, and the system-level evaluation applies to that combination. Responsibility also depends on local regulations.

The PC has an IEC 62368-1 certificate. Is that enough inside the patient environment?

Not necessarily. The certificate covers the PC's own standard; inside the patient environment the system-level requirements of Clause 16 also apply, leakage current in particular.

Can an ME system be evaluated from the console alone?

No. System-level items such as leakage current, MSOs and separation devices must be tested in the complete manufacturer-specified configuration.

Which SUNGO laboratory evaluates Clause 16, and under which accreditation?

The Hefei laboratory (Hefei SUNGO Medical Technology Co., Ltd.), within its IAS scope (TL-1119); the edition is confirmed at ordering.

Requesting a quote

If your product combines medical equipment with a PC, monitor, printer or similar, start with our medical electrical safety testing service. Tell us the system make-up, place of use, target market and standard edition, ideally with the component list, layout drawing and connection diagram, through our contact page.

About SUNGO Lab: What We Test

SUNGO Lab is made up of two independent companies, Shanghai SUNGO Medical Technology Co., Ltd. and Hefei SUNGO Medical Technology Co., Ltd., and focuses on medical device testing. Our core service lines are:

  • Wheelchair and mobility aid testing (Hefei laboratory): manual and powered wheelchairs, scooters, walking aids and crutches to the ISO 7176 series (excluding Part 19 crash testing and Part 20 standing wheelchairs), ANSI/RESNA WC-1/WC-2, EN 12183, EN 12184, the GB/T 18029 series and GB/T 12996-2024. Which accreditation (CNAS, CMA or IAS) covers each standard is as listed in our certificate scopes. See Wheelchair testing for FDA 510(k) and RESNA.
  • Medical electrical safety and EMC (Hefei laboratory, IAS accredited, certificate TL-1119): IEC 60601-1, IEC 60601-1-2, IEC 60601-1-8, IEC 60601-1-11 and ISO 80601-2-69, with the corresponding Chinese standards GB 9706.1 and YY 9706.102.
  • Testing for registration in China and overseas: we plan testing to the standards your target market requires (NMPA, FDA 510(k), EU CE marking and others) and issue the test reports for your submission; whether a report is accepted is decided by the regulator.

Our Shanghai laboratory also tests medical masks, gloves, surgical gowns, sterile packaging and sterilization-related items. CNAS and IAS are both signatories to the ILAC MRA. Send your product, target markets and standards through our contact page and we will confirm which laboratory and which accredited scope covers each test.

Need testing? Tell us your product and standards

Contact us directly
Phone
+86 132 4819 8029 (Mr. Gan)+86 177 5560 4650 (Mr. Luo)
E-mail
haixiao.gan@sungoglobal.comjun.luo@sungoglobal.com
Mon–Fri 9:00-18:00
WeChat QR CodeWeChatScan to add us on WeChat
Send us a message
About your personal information
  • Who collects it: Shanghai SUNGO Medical Technology Co., Ltd., the operator of this website. If the work you ask about is carried out by Hefei SUNGO Medical Technology Co., Ltd., we pass your enquiry to that company’s contact person for the same purpose.
  • What we collect: only what you type into the form above. The website’s access logs routinely record IP address and browser type, used only for security, troubleshooting and traffic statistics. Please do not enter ID numbers, medical records or other sensitive information.
  • Why: to reply to this testing enquiry. It is not used for bulk marketing; except for passing it to Hefei SUNGO Medical Technology Co., Ltd. as described above, it is not given to anyone else.
  • How long: 12 months from the day you submit it, then it is deleted. It is stored on a server in mainland China.
  • Your rights: contact us by the phone numbers or e-mail addresses above at any time to see, correct or delete what you submitted.