If your medical electrical equipment contains a microprocessor, a microcontroller or embedded software, an IEC 60601-1 safety evaluation (GB 9706.1 in China) will usually ask for the documentation behind Clause 14, Programmable Electrical Medical Systems (PEMS). Many manufacturers assume Clause 14 means "the laboratory tests the software" and cannot produce a development life-cycle, a verification plan or evidence of independent validation. This article covers Clause 14 only: how each subclause is checked, when it does not apply, which documents to prepare, how it links to the ISO 14971 risk management file, and which SUNGO laboratory does the work. IEC 62304 itself, software safety classes and cybersecurity testing are not covered.
Key points first
- A PEMS is ME equipment or an ME system that includes one or more programmable electronic subsystems (PESS). A PESS is a system based on one or more central processing units, including their software and interfaces. Clause 14 has 13 subclauses, 14.1 to 14.13.
- Subclauses 14.2 to 14.12 do not apply when no PESS provides functionality necessary for basic safety or essential performance, or when risk management under 4.2 shows that failure of any PESS does not lead to an unacceptable risk. Subclause 14.13 depends only on whether the PEMS is intended to be incorporated into an IT-network.
- Compliance is checked by inspecting the required documents and, where necessary, assessing them. The laboratory reviews the manufacturer's records; it does not develop or test the software.
- Subclauses 14.1 and 14.12 bring in IEC 62304 subclause 4.3 and Clauses 5, 7, 8 and 9. IEC 62304 is not within SUNGO's accreditation scope; this article only explains the cross-reference.
- Clause 14 documentation becomes part of the risk management file.
- IEC 60601-1, EN 60601-1 and GB 9706.1 are within the IAS accreditation scope of our Hefei laboratory (TL-1119), listed as whole standards without a year; Clause 14 is part of them.
Standards and scope
Three designations and their editions
IEC 60601-1, Medical electrical equipment – Part 1: General requirements for basic safety and essential performance. As of 2026-10-22 the IEC Webstore lists consolidated Edition 3.2, published 2020-08-20, which combines the 2005 third edition with the 2012 and 2020 amendments. Its normative references list ISO 14971:2019 and IEC 62304:2006 with Amendment 1:2015.
GB 9706.1-2020 is a mandatory Chinese national standard, published 2020-04-09 and in force from 2023-05-01. It is a modified adoption of IEC 60601-1:2012 (Edition 3.1) and replaces GB 9706.1-2007 and GB 9706.15-2008 in full. China's earlier PEMS requirements sat in the recommended industry standard YY/T 0708-2009, Medical electrical equipment – Part 1-4: General requirements for safety – Programmable electrical medical systems, which has since been withdrawn.
EN 60601-1 is the European version. According to the Estonian standards body EVS, its national consolidated text EVS-EN 60601-1:2006+A1+A12+A2+A13:2024, valid from 2024-05-15, combines EN 60601-1:2006 with A1:2013, A12:2014, A2:2021 and A13:2024, and is based on IEC 60601-1:2005 and its 2012 and 2020 amendments.
The summaries below follow the official text corresponding to Edition 3.1; for Edition 3.2 or GB 9706.1-2020, the wording of the edition you apply governs.
Clause 14 subclauses and the documents to prepare
Titles follow the Edition 3.2 table of contents. An asterisk means Annex A gives a rationale; informative Annex H covers PEMS structure, the development life-cycle and documentation. The third column is our suggestion, not text from the standard, and one document can cover several subclauses.
| Subclause | Title | Suggested documents |
|---|---|---|
| 14.1 * | General | Applicability decision (list of PESS, whether an IT-network connection is intended); process records for the relevant IEC 62304 clauses |
| 14.2 * | Documentation | Document control procedure; index of Clause 14 documents (number, revision, approval date) |
| 14.3 * | RISK MANAGEMENT plan | Risk management plan that references the PEMS validation plan |
| 14.4 * | PEMS DEVELOPMENT LIFE-CYCLE | Life-cycle document and development plan |
| 14.5 * | Problem resolution | Problem resolution procedure and problem records |
| 14.6 | RISK MANAGEMENT PROCESS (14.6.1 identification of known and foreseeable hazards, 14.6.2 risk control) | Hazard list including PEMS-specific causes; rationale for the tools and procedures used for risk control |
| 14.7 * | Requirement specification | System and subsystem requirement specifications |
| 14.8 * | Architecture | Architecture specification |
| 14.9 * | Design and implementation | Subsystem design and test specifications; description of the design environment |
| 14.10 * | VERIFICATION | Verification plan and records |
| 14.11 * | PEMS VALIDATION | Validation plan, methods and results; rationale for independence; record of staff relationships |
| 14.12 * | Modification | Modification/change procedure; change impact assessment |
| 14.13 * | PEMS intended to be incorporated into an IT-NETWORK | Network connection sections of the instructions and accompanying documents |
The title of 14.13 changed once. The Edition 3.2 redline shows the 2005 title "Connection of PEMS by NETWORK/DATA COUPLING to other equipment"; the Edition 3.1 text already has the current title, so Amendment 1 (2012) made the change. Older references to "network/data coupling" mean this subclause.
How each subclause is checked
Annex B states that Clause 14 may be evaluated independently of the test sequence. The laboratory checks the manufacturer's documents against each requirement and records the verdict clause by clause in the report.
14.1 Decide first whether it applies
- Does the equipment contain a PESS? If so, it is a PEMS.
- Does any PESS provide functionality necessary for basic safety or essential performance? If it does, can risk management show that failure of any PESS does not lead to an unacceptable risk? If neither can be ruled out, 14.2 to 14.12 apply.
- Is the PEMS intended to be incorporated into an IT-network? If so, 14.13 applies regardless of the answer to question 2.
A Q&A published by the Beijing Municipal Medical Products Administration on 2022-08-17 takes the same position for GB 9706.1-2020: if the PEMS is not intended to be connected to an IT-network, and no PESS provides functionality necessary for basic safety or essential performance (or risk management shows that failure of any PESS does not lead to an unacceptable risk), Clause 14 does not apply and no PEMS documentation is needed for testing.
Two points are easy to get wrong. First, a note says that when risk control measures are implemented in a PESS, Clause 14 is needed to show that PESS failure does not lead to an unacceptable risk; if software monitors temperature and switches off a heater, you cannot simply declare Clause 14 not applicable. Second, for software of unknown provenance (SOUP), subsystems of non-medical origin and legacy devices, the standard recognizes that the manufacturer might not be able to follow every Clause 14 process for such components, and the manufacturer should give particular consideration to the need for additional risk control measures.
Subclause 14.1 also requires the software development or modification of each PESS to meet IEC 62304:2006 subclause 4.3 (software safety classification) and Clauses 5, 7, 8 and 9 (the software development, risk management, configuration management and problem resolution processes). A note excludes the post-market monitoring and maintenance required by Clause 6 of IEC 62304. Records from these processes are part of the Clause 14 review.
14.2 Documentation and 14.3 Risk management plan
Subclause 14.2 requires Clause 14 documents to be reviewed, approved, issued and changed under a formal document control procedure; Annex A stresses the quality and accuracy of the documents. Subclause 14.3 requires the risk management plan to reference the PEMS validation plan, which a generic template may omit.
14.4 Development life-cycle and 14.5 Problem resolution
Subclause 14.4 requires a documented life-cycle with defined milestones, the activities and verification methods for each milestone, the inputs and outputs of each activity, the risk management activities to complete before each milestone, a plan for the specific development (activities, milestones, schedules) and documentation requirements. Annex A accepts various life-cycle models; Annex H.2 describes one.
Subclause 14.5 requires, where appropriate, a documented problem resolution system within and between all life-cycle phases and activities. It can cover reporting of problems affecting basic safety or essential performance, the risk of each problem, closure criteria and resolution actions.
14.6 Risk management process
Subclause 14.6.1 requires the hazard list to consider hazards associated with the software and hardware aspects of the PEMS, including those related to IT-network connection, components of third-party origin and legacy subsystems. The note lists causes such as undesired feedback (including input from electromagnetic disturbances), unavailable, incorrect or wrongly timed data, lack of data integrity, unintended interactions within and among PESS, unknown aspects or quality of third-party software or PESS, lack of data security (such as vulnerability to tampering or viruses), and failure of an IT-network the PEMS relies on. Subclause 14.6.2 requires suitably verified or validated tools and procedures to be identified for selecting and implementing each risk control measure.
14.7 Requirement specification, 14.8 Architecture and 14.9 Design and implementation
Subclause 14.7 requires a documented requirement specification for the PEMS and each of its subsystems, including the essential performance and risk control measures implemented by that system or subsystem. Annex A recommends that requirements be verifiable.
Subclause 14.8 requires an architecture that satisfies the requirement specification. Where appropriate, it uses high-integrity components, fail-safe functions, redundancy, diversity, partitioning of functionality and defensive design (such as restricting available output power or limiting actuator travel). It also takes into account the allocation of risk control measures to subsystems and components, failure modes and their effects, common cause failures, systematic failures, test interval and diagnostic coverage, maintainability, protection from reasonably foreseeable misuse and, where applicable, the IT-network specification.
Subclause 14.9 requires the design to be decomposed into subsystems where appropriate, each with a design and a test specification, and the design environment to be described in documented form.
14.10 Verification and 14.11 PEMS validation
Subclause 14.10 requires verification of every function that implements basic safety, essential performance or a risk control measure, under a plan stating the milestone for each function, strategies and techniques, the independence of the people involved, tools and coverage criteria. Results are documented.
Subclause 14.11 requires the validation plan to cover basic safety and essential performance, with methods and results documented. The staffing rules are the most often missed:
- the person with overall responsibility for PEMS validation is independent of the design team, and the manufacturer documents the rationale for the level of independence;
- no member of the design team is responsible for validating their own design;
- all professional relationships between validation and design team members are recorded in the risk management file.
If developers write, run and sign off their own validation protocol, 14.11 is not met.
14.12 Modification
When a design results from modifying an earlier one, either the whole subclause is applied as if it were a new design, or the continued validity of earlier design documentation is assessed under a documented modification/change procedure. Software modifications are also subject to the IEC 62304 clauses listed above.
14.13 PEMS intended to be incorporated into an IT-network
If a PEMS is intended to be connected to an IT-network that the manufacturer has not validated, the manufacturer provides instructions for the connection, covering its purpose; the required characteristics and configuration of the network; the technical specification of the network connection, including security; the intended information flows and routing between the PEMS, the network and other equipment; and a list of hazardous situations that could result from failure of the network. The accompanying documents must also tell the responsible organization that a network connection can bring previously unidentified risks, which it should identify, analyse, evaluate and control, and that later network changes (configuration, added or removed items, updates, upgrades) can introduce new risks. Compliance is checked by inspecting the instructions and accompanying documents.
A note gives an example: connecting a PEMS to a printer to transfer data forms a two-node IT-network; if the manufacturer validates the PEMS with that printer, the network is regarded as within the manufacturer's control.
Data security in 14.6.1 and 14.13 is a documentation requirement. Penetration testing and vulnerability scanning are not how Clause 14 compliance is judged, and they are not within SUNGO's accreditation scope.
Outside Clause 14: software identification
Subclause 7.2.2 requires software that forms part of a PEMS to carry a unique identifier, such as a revision level or release date. Designated people must be able to access it; it does not have to appear on the outside of the equipment. The software version on the test sample should match the documents; see Software-Containing Devices: Version Freeze and Traceability.
Linking Clause 14 to the ISO 14971 risk management file
Subclause 4.2.2 requires a risk management process that complies with ISO 14971 (Edition 3.1 cites ISO 14971:2007). Under the Edition 3.1 text, elements such as production and post-production monitoring are excluded. Compliance is checked by inspecting the risk acceptability policy, the risk management plan and the risk management file; a note recommends an index pointing to each record. Clause 14 builds on this file:
- Annex A states that Clause 14 documentation becomes part of the risk management file;
- the risk management plan references the PEMS validation plan (14.3);
- the hazard list adds PEMS-specific causes (14.6.1);
- relationships between validation and design staff are recorded in the risk management file (14.11).
We suggest tracing each software-implemented risk control measure from the hazard to the requirement specification (14.7), architecture allocation (14.8), verification (14.10) and validation (14.11), and adding a line per Clause 14 subclause to the index with document name, revision and section. The Beijing Q&A also notes that risk management carried out under the Chinese industry standard YY/T 0316 does not by itself make the documentation compliant with GB 9706.1-2020; it still has to be checked against GB 9706.1-2020. Separately, GB/T 42062-2022, a recommended national standard that is an identical adoption of ISO 14971:2019, has been implemented in China since 2023-11-01. For mapping the risk management file to test reports, see Mapping the Risk Management File to Your Test Reports.
Accreditation scope
The table lists the relevant entries in the IAS scope of our Hefei laboratory (TL-1119).
| Item | Standard / clause | Notes / limitations |
|---|---|---|
| Whole standard | IEC 60601-1 (no clauses listed, no year) | No limitation stated. Title on the scope: Medical electrical equipment - Part 1: General requirements for basic safety and essential performance |
| Whole standard | EN 60601-1 (no clauses listed, no year) | No limitation stated. Same title |
| Whole standard | GB 9706.1 (no clauses listed, no year) | No limitation stated. Same title |
Where SUNGO does this work and under which accreditation
- Laboratory: Hefei laboratory, Zipeng Town, Feixi County, Hefei, Anhui Province.
- Legal entity: Hefei SUNGO Medical Technology Co., Ltd., an independent legal entity.
- Accreditation: IAS, certificate TL-1119, scope effective 2026-06-04. Clause 14 is reviewed as part of an IEC 60601-1, EN 60601-1 or GB 9706.1 evaluation, and an IAS report is issued.
- The IAS scope does not state years. State the edition when you place the order, for example IEC 60601-1 Edition 3.2 or GB 9706.1-2020, and confirm it with the laboratory before an IAS report is issued against it.
- Under subclause 1.4, particular standards can modify, replace or delete general requirements, so their provisions govern where they exist. Apart from the oxygen concentrator standards (ISO 80601-2-69, EN ISO 80601-2-69, YY 9706.269), SUNGO's scope contains no other particular standards of the IEC 60601-2-x, ISO/IEC 80601-2-x or GB/YY 9706.2xx series.
- IEC 62304, ISO 14971, YY/T 0316, GB/T 42062, YY/T 0708-2009, GB 9706.15-2008 and cybersecurity testing are mentioned for background only and are not within SUNGO's accreditation scope. The scope of Shanghai SUNGO Medical Technology Co., Ltd. (laboratory at 958 Kangqiao East Road, Pudong, Shanghai) does not include the standards in this article.
- Confirm in advance with the relevant regulator or notified body whether a report will be accepted for registration or certification in a given market, including NMPA registration testing in China.
Preparing a submission
- Applicability decision: record the 14.1 outcome and reasons; if 14.2 to 14.12 do not apply, submit the supporting risk analysis.
- Document index: list document name, number, revision and section for each subclause.
- Controlled documents: submit approved, released revisions whose cross-references agree.
- Software version: the sample, the documents and the 7.2.2 identifier should all match.
- Third-party components: list SOUP, third-party PESS and legacy subsystems, with the additional risk control measures considered.
- Validation independence: the validation lead and team, and their recorded relationships with the design team.
- Network information: if an IT-network connection is intended, the sections of the instructions that address 14.13.
- Edition, market and language: state the edition and target market in the order and agree the document language in advance.
FAQ
The device has only one microcontroller. Do we still need Clause 14 documents?
Start with 14.1. If the microcontroller provides no functionality necessary for basic safety or essential performance, or risk management shows its failure cannot lead to an unacceptable risk, and no IT-network connection is intended, Clause 14 does not apply. Record that decision in the risk management file.
Does the laboratory test the software under Clause 14?
No. Clause 14 is judged by inspecting documents and, where necessary, assessing them. The manufacturer carries out software testing under its own verification and validation plans, and the laboratory reviews those plans and records.
We already have IEC 62304 documentation. What else does Clause 14 need?
Clause 14 has requirements of its own, for example the risk management plan referencing the validation plan, the architecture specification, independent validation staff and the IT-network instructions. Check these separately.
Our only connection is a USB service port. Does 14.13 apply?
It depends on the intended use. An IT-network is defined as providing wired or wireless transmission between two or more specified communication nodes, and the note treats a printer connected for data transfer as a two-node network. Record your reasoning in the risk management file and confirm with the laboratory before submission.
Which SUNGO laboratory reviews Clause 14, and under which accreditation?
The Hefei laboratory (Hefei SUNGO Medical Technology Co., Ltd.), within its IAS accreditation (TL-1119). The edition is confirmed when you place the order.
Requesting a quote
If your equipment contains a microprocessor or embedded software and needs an IEC 60601-1 or GB 9706.1 safety evaluation, start with our medical electrical safety testing service. In your request, give the product name, whether an IT-network connection is intended, the target market and the standard edition, ideally with your Clause 14 document index and software version details, and send it through our contact page.
About SUNGO Lab: What We Test
SUNGO Lab is made up of two independent companies, Shanghai SUNGO Medical Technology Co., Ltd. and Hefei SUNGO Medical Technology Co., Ltd., and focuses on medical device testing. Our core service lines are:
- Wheelchair and mobility aid testing (Hefei laboratory): manual and powered wheelchairs, scooters, walking aids and crutches to the ISO 7176 series (excluding Part 19 crash testing and Part 20 standing wheelchairs), ANSI/RESNA WC-1/WC-2, EN 12183, EN 12184, the GB/T 18029 series and GB/T 12996-2024. Which accreditation (CNAS, CMA or IAS) covers each standard is as listed in our certificate scopes. See Wheelchair testing for FDA 510(k) and RESNA.
- Medical electrical safety and EMC (Hefei laboratory, IAS accredited, certificate TL-1119): IEC 60601-1, IEC 60601-1-2, IEC 60601-1-8, IEC 60601-1-11 and ISO 80601-2-69, with the corresponding Chinese standards GB 9706.1 and YY 9706.102.
- Testing for registration in China and overseas: we plan testing to the standards your target market requires (NMPA, FDA 510(k), EU CE marking and others) and issue the test reports for your submission; whether a report is accepted is decided by the regulator.
Our Shanghai laboratory also tests medical masks, gloves, surgical gowns, sterile packaging and sterilization-related items. CNAS and IAS are both signatories to the ILAC MRA. Send your product, target markets and standards through our contact page and we will confirm which laboratory and which accredited scope covers each test.